Jaipur Airport Expansion Begins With ₹600 Crore Makeover and 14 New Projects is set to redefine how travelers experience Rajasthan’s Pink City. This landmark initiative by Jaipur International Airport Ltd. (JIAL)—now under Adani Airports—includes 14 integrated projects with a total outlay north of ₹600 crore (≈ US $72 million). The goal? To streamline passenger flow, boost capacity, and fuse modern comforts with local heritage flair.
In FY 2024–25, Jaipur handled over 6 million passengers, marking a 10.8% year-on-year growth. The airport needs to stay ahead of surging leisure and business traffic as Rajasthan’s tourism rebounds and new routes launch under the UDAN scheme.

Jaipur Airport Expansion Begins With ₹600 Crore
Feature | Details |
---|---|
Organization / Operator | Jaipur International Airport Ltd. (Adani Airports) |
Project | Jaipur Airport Expansion – 14 Integrated Projects |
Total Investment | ₹600 crore+ (≈ US $72 million) |
Terminal 2 Expansion | +15,000 m² side-wing • Check-in counters 63 (up from 39) • 8 Self-Baggage-Drop units |
Security Upgrade | 18 XBIS lanes (up from 9) with Automated Tray Retrieval System (ATRS) |
Boarding Infrastructure | 10 boarding gates (up from 6) • 6 aero-bridges (up from 4) |
Apron Capacity | 18 Code C parking stands (up from 14) |
Heritage Terminal 1 | Re-opened 27 Oct 2024 for international flights • Capacity 1.5 million ppa |
Runway / ATC | CAT-IIIB compliant runway • New digital ATC tower with ADS-B surveillance |
Passenger Growth Impact | Peak-hour throughput +60 % • Projected traffic 10 million ppa by FY 2029-30 |
Jobs & Local Procurement | ~4,000 construction + 1,200 long-term ops roles • ₹150 crore local sourcing target |
Sustainability Goals | IGBC “Gold” certification • LED lighting • Rain-water harvesting • Solar-PV canopies |
Construction Timeline | Shell completion Mar 2026 • Systems fit-out Oct 2026 • Full go-live Q1 2027 |
Funding Model | 100 % private equity & internal accruals (no state budget support) |
Metro & Road Links | Pink Line Metro Phase II to forecourt (2027 target) • NH-52 cargo underpass |
Official Portal |
The Jaipur Airport Expansion Begins With ₹600 Crore Makeover and 14 New Projects is more than concrete and steel—it’s a holistic upgrade blending capacity, culture, and cutting-edge tech. By 2027, you’ll breeze through biometric gates, enjoy local cuisine under sustainable canopies, and step onto flights powered by a low-carbon terminal. For businesses and professionals, this project unlocks roles in engineering, IT, retail, and green consulting. Above all, it ensures Jaipur remains India’s heartfelt gateway to legend and lore.
Why This Expansion Matters
Rajasthan’s Tourism Surge
Rajasthan’s heritage circuit—including Jaipur’s palaces, forts, and festivals—draws tens of millions annually. But limited airport capacity constrains growth: long queues can deter even the most enthusiastic travelers. This ₹600 crore upgrade will lift peak‐hour handling by 60%, helping the state capture more of India’s booming domestic and inbound tourism market.
A Private-Sector Success Story
Unlike many airport projects, this expansion is 100% privately funded via Adani’s equity and airport-revenue accruals—no state budget support. It aligns with Adani’s broader plan to invest US $7 billion in eight airports over the next decade, targeting 300 million passengers by 2040 across its network.
What’s New—Facilities & Features
1. Terminal 2: Bigger, Faster, Smarter
- 15,000 m² side-wing: Houses 24 additional counters, eight SBD units, and a dedicated Automated Tray Retrieval System (ATRS) for no-touch security trays.
- Check-in upgrade: Counters rise from 39 to 63, slashing queues.
- Security lanes: XBIS lanes double to 18, with ATRS cutting manual handling by 80%.
- Boarding & aero-bridges: Four new gates and two glass aero-bridges reduce bus transfers, cutting turnaround times by up to 20 minutes.
- Digital wayfinding & biometrics: Real-time flight updates on touchscreens, mobile app integration, and facial-recognition boarding in pilot zones.
Imagine stepping off your flight, tapping your face at a biometric gate, and being guided by digital signs to your ride—all within five minutes.
2. Heritage Terminal 1: A Pink-City Welcome
- Reopened 27 Oct 2024 for international flights, this restored sandstone terminal features Jaipuri jharokha motifs, block-print murals, and eight immigration desks.
- Separating international and domestic flows frees capacity in T2 and gives foreign visitors an authentic Rajasthan greeting.
3. Immigration & Customs Tech
- e-Visa kiosks and e-gate facial-recognition systems cut immigration time by 50%.
- Automated baggage scanners with explosive-detection algorithms meet global security benchmarks set by ICAO.
4. F&B, Retail & Lounges
- 3,500 m² retail zone in the forecourt hosts 15 outlets—local handicraft stalls next to global cafés.
- CIP Lounges: Expanded seating, children’s play areas, nap pods, and prayer rooms.
- A local cuisine corner showcases Rajasthani street‐food concepts like pyaz kachori and ghewar.
5. Ground Transport & Connectivity
- Metro Pink Line Phase II (under construction) will link the airport directly to city center by 2027.
- Dedicated BRT lanes, multi-modal hubs with taxi, app-taxi, and e-rickshaw stands ease last-mile travel.
- NH 52 underpass for cargo trucks bypasses passenger forecourt, reducing congestion.
6. Air-Traffic Control & Runway
- New ATC tower with ADS-B surveillance and digital ground-movement systems.
- CAT-IIIB runway upgrades ensure operations in low visibility, cutting weather-related delays by 70%.
7. Cargo & Logistics
- Apron re-marking and four new Code C stands boost cargo flights.
- E-commerce corridor with a dedicated cargo road speeds transit for perishables and handicrafts.
- Jaipur handled 18,513 tonnes in FY 2023–24 (up 13% YoY)—a boon for SMEs .
Sustainability & Climate Resilience
- IGBC “Gold” target for new works, echoing Adani’s Mumbai and Ahmedabad terminals.
- Energy-efficient glazing, full LED lighting, and solar PV canopies over parking lots.
- Rainwater harvesting and sewage-water recycling irrigate 40,000 m² of green spaces.
- Heat-mitigation design: Light-reflective roofing, shaded walkways, and water-misted waiting areas.
By building for monsoon resilience and desert heat, Jaipur is setting a benchmark for sustainable airport design.
Step-by-Step Guide: How Major Airport Expansions Unfold
Stage | Key Tasks | Jaipur Example |
---|---|---|
1. Feasibility & Forecast | Passenger forecasts, trend analysis | 6 M ppa base; 10% CAGR scenarios |
2. Master Planning | Layout design, tech & sustainability integration | East-wing on T2; heritage reuse in T1 |
3. Approvals & Funding | DGCA, AAI clearances; EIA; private equity sourcing | 100% private capex (₹600 cr) |
4. Tendering & Contracts | Civil, MEP, IT, F&B RFPs | ATRS & biometric supplier sealed Q4 2024 |
5. Construction | Phased night-works, live-ops coordination | Taxiway closures mid-2026; nightly hoarding |
6. Testing & Commission | Mock drills, systems integration, staff training | 72-hour full-load drill Nov 2026 |
7. Launch & Monitoring | Gradual switchover; KPI tracking (wait times, throughput) | Target: 9 min avg. security queue; 4 000 jobs onboarded |
Practical Advice
For Travelers
- Check live updates on the official site or mobile app before you leave.
- Use online check-in and head straight to SBD counters.
- Follow colored floor markers: green for T1 (international), blue for T2 (domestic).
- Pack carry-on essentials in case of brief conveyor reconfigurations.
For Professionals & Businesses
- Engineers & Contractors: Monitor Adani’s e-procurement portal for quarterly RFPs.
- Retailers & F&B Brands: Apply for pop-up spaces in the forecourt’s artisan kiosks.
- Green Consultants: Offer rainwater-harvest and HVAC energy-recovery solutions.
- Aviation Analysts: Propose new routes leveraging extra gate availability.
Global & Future Outlook
Adani aims to triple passenger capacity across its airport portfolio to 300 million by 2040. Jaipur’s “heritage-plus-brownfield” model may extend to Lucknow, Guwahati, and beyond. Meanwhile, Terminal 3 concept plans envisage a 150,000 m² facility on the eastern side once traffic breaches 10 million ppa (by FY 2029–30), potentially merging all operations under one world-class roof.
New Expressway Project Between Noida & Greater Noida in the Works – Details Here
Income Tax 2025: How Frequently Can You Switch Between Old and New Regime
Salary Set to Surge! 8th Pay Commission Expected Hike and New Pay Matrix Details Explained
Risks & Mitigation
Risk | Mitigation |
---|---|
Cost overruns on imported MEP equipment | 75% of HVAC & façade sourced locally to hedge currency volatility |
Passenger disruption during works | Night-only construction; live-ops committee meets weekly |
Environmental compliance concerns | Quarterly IGBC audits; monsoon-grade drainage design |
Cargo-road bottlenecks | Dedicated NH 52 underpass for trucks, bypassing passenger plaza |
Frequently Asked Questions
1. Will airfares rise due to the upgrade?
Airfares follow market demand; any change in User Development Fee (UDF) needs AERA approval—none announced yet.
2. How long will construction last?
Major shell works finish by Mar 2026, fit-out by Oct 2026, full switch-over by Q1 2027.
3. Is parking capacity increasing?
Yes—a new 750-slot multi-level car park with EV chargers opens in tandem with T2 expansion.
4. Can local artisans secure retail space?
Five dedicated handicraft kiosks are reserved under a state-MoU; look for tender notices on the airport site.